Site updates without the paperwork.
Record what happened on site, add photos and labour, then turn the week's updates into a professional client progress report.
Built for small builders and contractors.
Today's update
What happened on site today?
Foundation blockwork brought up to floor level.
Who was on site?
- Mick Byrne — Builder8h
- Sean Kelly — Labourer8h
Photos



Oakview House Extension · 28 Sep – 4 Oct
Work completed
- - Foundations excavated and concrete poured.
- - Foundation blockwork built up to floor level.
- - Floor slab poured.
Labour / trades involved
- Mick Byrne — Builder — 40 hours
- Johnny Murphy — Plumber — 4 hours
- Sean Kelly — Labourer — 40 hours
The job is already being documented. Just not in one place.
Before TradeSpan
- WhatsApp messages
- Camera roll
- Phone calls
- Notebook
- Memory
By Friday, the information is scattered everywhere.
With TradeSpan
- Daily site update
- Project history
- Weekly client report
Everything recorded during the week is ready when you need the client update.
From site update to client report in three steps.
- 1
Log the day
What happened on site today?
Hardcore placed and compacted inside extension.
Anything holding the job up?
Concrete wagon about 1 hour late.
Record what was completed, delays, deliveries, labour, client decisions and what's next.
- 2
Add photos and labour



- Mick Byrne — Builder8h
- Johnny Murphy — Plumber4h
Keep site photos and who worked on the job attached to the correct day.
- 3
Create the report
Weekly progress reportProgress summary
Foundations poured and blockwork brought up to floor level. Floor slab poured on Friday.
At the end of the week, TradeSpan turns the recorded updates into a professional report you can review and send.
Everything needed for the Friday update.
- Work completed
- Labour & hours
- Plant / equipment
- Materials / deliveries
- Weather / site conditions
- Delays / issues
- Visitors / inspections
- Client decisions
- Next steps
- Site photos
A report you're happy to send to the client.
TradeSpan turns rough site notes into a clear, branded weekly progress report while keeping the recorded facts intact.
Print, save as PDF or copy the text
- Project
- Oakview House Extension
- Client
- Sarah & Mark Doyle
- Site address
- 14 Oakview Drive, Naas, Co. Kildare
- Reporting period
- Mon 28 September – Sun 4 October 2026
Progress summary
Foundations for the rear extension were excavated and poured this week. Foundation blockwork was built up to floor level and the drainage run along the rear was installed and tested. Hardcore, floor insulation and the damp-proof membrane were installed and the floor slab was poured on Friday.
Work completed
- - Site set up; foundations excavated and spoil removed.
- - Foundation steel checked and concrete poured.
- - Foundation blockwork built up to floor level.
- - Drainage run installed along the rear and tested.
- - Floor slab poured and site cleaned down.
Labour / trades involved
- Mick Byrne — Builder — 40 hours
- Johnny Murphy — Plumber — 4 hours
- Sean Kelly — Labourer — 40 hours
Additional labour notes: JCB driver for excavation; concrete crew for the pours.
Site photos

Foundations dug at rear

Foundations poured

Blockwork at floor level

Floor slab poured
Delays / issues
- Ground at the back corner was wetter than expected, so the foundation was dug slightly deeper.
Try it on a real project.